Cherrylane residential Development

Specializing in turnkey residential development, at Cherrylane in Thornton, IHC Scott performed 408,000 cubic yards of overexcavation and 124,000 yards of onsite cuts to fills. IHC Scott then installed over 6,000 feet of water and sewer mains and 3,600 feet of storm. Then, after installing over two and a half miles of curb and gutter and a mile of sidewalk, 34,700 square yards of asphalt roadways were paved, with new signage and striping, for this 41 acre site.