Montaine Residential Development pipeline industry installation

Montaine is a 1,200-home development by Toll Brothers in Castle Rock – IHC Scott has been working on various phases of this project since 2019. Our initial work included a 3-mile-long loop road, which was constructed in anticipation of future filings within the community. In 2020 we completed our work in Filing 2, which included the first 106 lots.

Toll Brothers has not slowed down in 2020, even with the impact of COVID-19; with increasing demand, the pace of construction at Montaine has increased. To expedite construction, Toll Brothers has hired additional contractors to deliver as many completed lots as possible. As a result, Montaine has become a very successful and competitive project.

In 2021, IHC Scott was awarded work for Filing 5 and Filing 2 Replat. In Filing 5, we are installing 3,000 LF of sewer, 4,000 LF of waterline, and 3,750 LF of RCP, and then prepping the streets with CTS and pouring combo curb and gutter sidewalk with the utility crew completing the pipework. In Filing 2 Replat, we are initially contracted for the mass earthwork, with the intent of also being awarded the utility and concrete

IHC Scott and Toll Brothers have developed a great working relationship at Montaine and look forward to the work we have this year and in future filings to come!