University of Colorado new Longmont hospital campus concrete structure

For the University of Colorado’s new Longmont hospital campus, IHC Scott worked with Haselden Construction to provide 50,000 cubic yards on earthwork, realigning the Oligarchy Ditch in 1,250 feet of new 8’x10’ box culvert. Over 16,000 feet of new storm drainage and 80 inlets complete the drainage system. To this, Scott added 6,600 feet of sanitary main, and 5,000 feet of new water line.

To complement its earthwork and utilities work at the new UCH campus in Longmont, IHC Scott installed multiple drainage structures, including 1,250’ of 8’x10’ box culvert, 16,000 feet of storm drainage, and 80 new inlet structures.